FY 2024 Educational Facilities Master Plan

06 Glen Ave Elementary Facility Needs 6.04.203 New, Replacement, or Renovation - Studies / Planning Originally constructed in 1964 this 55,068 sf school with grades 2-5 has had minimal renovations and additions over the years but will have an average age of 53 by 2023. This school has been identified with a FQI of 48 due to several systemic problems including roofing, windows, electrical and plumbing systems. Project Description Create a study to design and develop a full renovation/modernization or replacement school. Total cost is an estimate only and must be adjusted to the project chosen during the feasibility study. 6.7.566 Renovation - Studies / Planning A portion of the school is designed as open classrooms. Project Description Study the options to create individual secure classrooms. FY24 funds are to secure design services. FY25 funds are a rough estimate which would be revised based on the study. 6.11.570 Site - Paving / Parking Lots The parking lot is undersized and there are circulation issues with parent and bus drop off that rise safety concerns. Project Description Design and construct revised parking area. Feasibility study is underway. 6.13.567 Systemic Renovation - Plumbing The fixtures, finishes, accessories and partitions in the toilet rooms have either already reached or will be reaching the end of their life cycle, which necessitates replacement. Project Description Renovate existing toilet rooms. Analyze toilet rooms for accessibility. 6.06.482 Systemic Renovation - Security and/or Fire Alarm The existing fire alarm system has reached the end of its useful life in Areas A through D based on age but remains operational. Project Description Upgrade or replace the existing fire alarm system in Areas A through D. Wicomico County Public Schools Educational Facilities Master Plan FY2023 160

RkJQdWJsaXNoZXIy MTI2NzY2OQ==