18 Westside Intermediate Facility Needs 18.13.599 Systemic Renovation - HVAC Originally constructed in 1999 this school will be 24 years old in 2023 and many of its HVAC systems are approaching the end of their useful life based on age. Project Description The building is served by a geothermal system which is in good working condition and results in lower operating costs and longer operating life. The geothermal system will be reused with selective replacement of terminal equipment with new energy efficient equipment based on latest codes and available technologies. Wicomico County Public Schools Educational Facilities Master Plan FY2023 174