46 Wicomico High School Facility Needs 46.05.136 Special Initiatives - Science (Look of the Future) State initiative to upgrade and modernize science classrooms in all high schools for the next century. Project Description These funds would allow for the design and renovation of the existing science facilities. 46.06.445 Systemic Renovation - Lighting Systems Lighting systems and ceilings have passed their useful life in areas A through I. Upgrades are needed in order to provide adequate lighting levels and additional operational efficiencies. Project Description Upgrade lighting fixtures and associated ceilings that have exceeded their useful lives. Project includes electrical service upgrades and branch wiring as required to accommodate new lighting. 46.06.519 Systemic Renovation - Plumbing Wicomico High School is unique in that it is a large campus style school. Throughout the sprawling campus, the original domestic water piping is corroding from the inside out. Associated piping is becoming clogged with particles and with that, it is recommended that all of the interior and exterior (to the main) domestic water piping be replaced. Along the same lines, the original sewer piping continues to age with each passing year. These pipes shall be monitored and replaced when necessary. Project Description Working in phases, replace the original domestic and sewer piping throughout the school campus. A new design will be necessary to determine if the funding amount will be adequate. Total cost is an estimate only and must be adjusted based on design. 46.06.366 Systemic Renovation - Roofs As part of the Roof Refurbishment Program this school is due for a roof replacement. Project Description Identified Buildings throughout the campus are due for roof replacements for a total of 210,776 sf, average age of roof area will be 35 to 41 in 2023. It is anticipated the project will be completed in phases over three Summers to minimize impact to instruction. Another State funding source was secured in FY23. The FY24 County and State requests fund the last phase of the project. The FY24 County request is the remainder of the required local share. Wicomico County Public Schools Educational Facilities Master Plan FY2023 194
RkJQdWJsaXNoZXIy MTI2NzY2OQ==