05 Fruitland Intermediate Facility Needs 5.13.536 Systemic Renovation - HVAC With the last major renovation in 1990, multiple HVAC systems will be 34 years old in 2024 and are reaching the end of their useful life. Project Description Provide new energy efficient HVAC systems based on latest codes and available technologies. 5.13.534 Systemic Renovation - Lighting Systems Lighting systems and ceilings have passed their useful life. Upgrades are needed in order to provide adequate lighting levels and additional operational efficiencies. Project Description Upgrade lighting fixtures and associated ceilings that have exceeded their useful lives. Project includes electrical service upgrades and branch wiring as required to accommodate new lighting. 5.13.578 Systemic Renovation - Plumbing The existing boiler has reached the end of its useful life based on age. Project Description Replace existing gas/oil fired boiler for hot water. 5.13.535 Systemic Renovation - Windows / Doors/ Hdwr The existing exterior aluminum windows and doors have reached the end of their useful life based on age. Project Description Replace the existing exterior windows and doors. Wicomico County Public Schools Educational Facilities Master Plan FY2024 154
RkJQdWJsaXNoZXIy MTI2NzY2OQ==