FY 2025 Educational Facilities Master Plan

06 Glen Ave Elementary Facility Needs 6.04.203 Renovation/Addition - Studies / Planning Originally constructed in 1964 this 55,068 sf school with grades 2-5 will have an average age of 54 by 2024. The existing Glen Avenue has received various systemic upgrades in recent years including roof, HVAC, and windows/doors. The building is aging and requires additional renovations and assessment of the programmatic needs to meet the current student population. A portion of the school is designed as open classrooms. Project Description Conduct a feasibility study to investigate the options for minor renovations and an addition. Total cost is an estimate only and must be adjusted to the project chosen during the feasibility study. 6.13.567 Systemic Renovation - Plumbing The fixtures, finishes, accessories and partitions in the toilet rooms have either already reached or will be reaching the end of their life cycle, which necessitates replacement. Project Description Renovate existing toilet rooms. Analyze toilet rooms for accessibility. 6.06.482 Systemic Renovation - Security and/or Fire Alarm The existing fire alarm system has reached the end of its useful life in Areas A through D based on age but remains operational. Project Description Upgrade or replace the existing fire alarm system in Areas A through D. 6.13.630 Systemic Renovation - Sprinkler There is no fire protection system (sprinklers) in this building. A portion of the building is designed as open classrooms and requires sprinklered prior to enclosure from a safety & security standpoint. Project Description Design and install a fire protection system (sprinklers) and tie into Fire Alarm as needed. Wicomico County Public Schools Educational Facilities Master Plan FY2024 156

RkJQdWJsaXNoZXIy MTI2NzY2OQ==