FY 2025 Educational Facilities Master Plan

WCPS REGIONAL PROGRAM INVENTORY 5.7 Regional Program PSC # School Dedicated Space Square Feet Current Enrollment Capacity Notes Career & Technology Education 22.001 Parkside High School Career & Technology Center 113,546 1,218 Unknown No major changes anticipated in next five years. Interactive Media and Design 22.009 Wicomico High School within existing building Unknown Unknown Unknown No major changes anticipated in next five years. SF within existing 195,941 sf building. Army Junior Reserve Officer Training Corps (JROTC) 22.009 Wicomico High School within existing building Unknown 130 Unknown No major changes anticipated in next five years. SF within existing 195,941 sf building. Magnet Program 22.004 North Salisbury Elementary School within existing building Unknown 227 270 Program for 3rd-5th grades with 3 classes at each grade level - 9 classrooms total for core instruction with access to music, art, library, & PE instructional spaces. SF within existing 76,999 sf building. No major changes anticipated in next five years as the current 3 classrooms per grade level model is anticipated to be maintained. WBMS Broadcasing Media Studies Academy 22.030 Bennett Middle School within existing building TBD - 150 New 6-8 grade program to start SY2024-2025. Anticipate 50 students in fall sixth grade cohort and will continue to grow by 50 each year until reach capacity. SF within existing 167,013 sf building. Young Business Leaders Academy 22.015 Wicomico Middle School within existing building TBD - 150 New 6-8 grade program to start SY2024-2025. Anticipate 50 students in fall sixth grade cohort and will continue to grow by 50 each year until reach capacity. SF within existing 135,750 sf building. NexGen STEM Academy 22.025 Salisbury Middle School within existing building 6,290 145 150 Current 6-8 grade program to be maintained with existing cohorts. No major changes in the next five years. SF within existing 143,519 sf building. Evening High School 22.001 Parkside High School Schumaker Modular Complex on site 21,321 36 100 No major changes anticipated in next five years. Choices Academy N/A N/A Choices Modular Complex 20,860 101 120 No major changes anticipated in next five years. Enhanced Pathways N/A N/A 2 Portables located on Choices Modular Complex site 1,800 3 10 No major changes anticipated in next five years. Early Learning Transitions - Primary 22.031 Wicomico Early Learning Center (WELC) existing building 11,321 Unknown Unknown Program began in SY2023-2024 for PreK and K students. In SY20242025 the program will grow to accept 1st and 2nd grade students. Visual and Performaing Arts Program (VPA) 22.009 Wicomico High School within existing building Unknown 40 45 SF within existing 195,941 sf building. VPA Art meets in three art rooms at Wicomico High School. VPA music meets in two music rooms (and connected practice rooms). VPA theatre meets on the stage, the light booth, in the auditorium, and in the scene shop room. In SY2024-2025, we will add a VPA Theatre class in the chorus room at Parkside. 209

RkJQdWJsaXNoZXIy MTI2NzY2OQ==