8 46.06.519 Wicomico High School: Systemic Renovation - Plumbing Working in phases, replace the original domestic and sewer piping throughout the school campus. A new design will be necessary to determine if the funding amount will be adequate. Total cost is an estimate only and must be adjusted based on design. Project Description Estimate/Funding Initial Total Estimate Revised Total Estimate Cost Share Split of Total Estimate County State Prev. Approved Funding Remaining Funding Wicomico High School is unique in that it is a large campus style school. Throughout the sprawling campus, the original domestic water piping is corroding from the inside out. Associated piping is becoming clogged with particles and with that, it is recommended that all of the interior and exterior (to the main) domestic water piping be replaced. Along the same lines, the original sewer piping continues to age with each passing year. These pipes shall be monitored and replaced when necessary. 06/02/2017 $3,000,000 $3,000,000 $0 County State $0 $0 County State $3,000,000 $0 9 44.11.652 CTE Parkside: Site - Fields and Grounds - Greenhouse Demo the existing greenhouse. Design and construct a new greenhouse where the existing greenhouse is located and tie in all necessary utilities. Project Description Estimate/Funding Initial Total Estimate Revised Total Estimate Cost Share Split of Total Estimate County State Prev. Approved Funding Remaining Funding One of the two greenhouses used to support CTE instruction is reaching the end of useful life. 07/02/2025 $450,000 $450,000 $0 County State $0 $0 County State $450,000 $0 FY2027 Project Priority List - Project Detail Priority Project County WCPS: Planning + Construction FY 2027 CIP (FINAL 9.2.2025) 14
RkJQdWJsaXNoZXIy MzAyOTMwNA==