FCI Poor Good FACILITY STATUS 15 40 0 70 Excellent 38 UTILIZATION% Under Crowded Optimum Over 80 100 90 106 130 128 PROJECTED ENROLLMENTS VS SRC SRC FTE CR: 9 Relocatables: Total Rms: 9 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 FTE 1207 1167 1151 1161 1183 1204 1233 1264 1313 1348 1367 SRC 944 944 944 944 944 944 944 944 944 944 944 Diff 263 223 207 217 239 260 289 320 369 404 423 1207 1167 1151 1161 1183 1204 1233 1264 1313 1348 1367 944 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1 3 6 12 18.8 WEIGHTED SCORE 24 04/23/2026 PARKSIDE HIGH 1974 52 164,178 sf *does not include CTE Center 55.60 9th-12th Grades: Original Build: Average Age: Building Area: Land Acres: 192
RkJQdWJsaXNoZXIy MzAyOTMwNA==