60 All Elementary Schools Facility Needs 60.1.659 Addition - Construction With increasing enrollments there are capacity concerns at various locations. A boundary line adjustment is being implemented in SY2025-2026 but if growth continues, additional classroom space may be needed at some locations. Project Description Design and construct a 4-6 classroom pre-engineered addition. Total cost is an estimate only based on 4 classrooms, does not include escalation costs, and must be adjusted to the specific location. 60.1.660 Addition - Construction With increasing enrollments there are capacity concerns at various locations. A boundary line adjustment is being implemented in SY2025-2026 but if growth continues, additional classroom space may be needed at some locations. Project Description Design and construct a 4-6 classroom addition. Total cost is an estimate only based on 4 classrooms, does not include escalation costs, and must be adjusted to the project once a design team is hired and a schematic design is reviewed. 60.1.661 Addition - Construction With increasing enrollments there are capacity concerns at various locations. A boundary line adjustment is being implemented in SY2025-2026 but if growth continues, additional classroom space may be needed at some locations. Project Description Purchase and locate a 4-6 classroom relocatable where necessary to support capacity concerns. Total cost is an estimate only based on 4 classrooms, does not include escalation costs, stormwater management requirements, or sprinkler requirements, and must be adjusted to the specific location. Total cost will vary if a used unit is available or if a new unit must be purchased. Wicomico County Public Schools Educational Facilities Master Plan FY2026 207
RkJQdWJsaXNoZXIy MzAyOTMwNA==